This is a step by step blow of a rebuild of a dead Wing I got a few months back. Bear with me as I experiment with the site and make it a informative as can. If you have any suggestions on what I am doing please feel free to add your comments or contact me directly.
Saturday, February 28, 2009
Seized engine
After months of work getting the bike to the point where I could try to run it. I ran into a major road block. On trying to time the bike I noticed the engine would not turn at all. I had never tried it before I started any work as it was a low mileage motor and I was told it had been turned. The gentleman was an honorable person and I believed him... I still do. I believe the problem was created when I clean the motor, though I had taken ever precaution to seal all entry to the cylinders I believe I had a small leak causing rust to build up in the cylinders. Below is the pictures from the left bank (which is relatively clean) and the right (this is where the damage occured). I had spent a good week and a half soaking these cylinders down with Marvel Mystery Oil but could never get them to budge. Here they are.

Sunday, February 1, 2009
Friday, January 16, 2009
Carb rebuild process
Tuesday, January 13, 2009
I'll have more for you guys later but I have hit a stumbling block on the swingarm. Upon assembling the swingarm I had a small problem. The swingarm bolts would not thread all the way through the frame and started messing up the threads, just on the right side, the left side threaded. I think its the powder coating but I can't see anything. So rather than mess up the bolts I ordered the tap to clean out the threads. Its a 30mm x 1.5mm if anyone is interested, and it is expensive. Killed me to do it but I want this right. Once I get the threads cleaned up and mounted will have more to post. In the mean time I have started the complete rebuild of the carbs. Once those are done they will be polished and perfect. I am using Randakks master rebuild kit to do it. After much research his kit is by far the best on the market. I bought the book to.
Later and Happy New Year!
Later and Happy New Year!
Thursday, November 20, 2008
These pictures show the swingarm mounted on the frame and the drive shaft installed. Looks like there is a ton of room. I think I can gain a total of 1.5 inches of room for a larger tire. I will test it farther by moving the swingarm in different positions to see where it could possibly rub then I will have the new patch welded on the swingarm. Once thats done its off to the powder coating shop for the finish, install the new bearing then on the frame.
Subscribe to:
Posts (Atom)